Telecom & Fiber Permit Data
Telecom permit data records wireless and fiber network construction as local jurisdictions authorize it: tower builds and modifications, antenna co-location, small cell nodes, equipment shelters, and fiber and conduit routes. Builty structures these nationally at address and route level.
Network build, one local permit at a time
Wireless and fiber buildout is announced in aggregate and disclosed quarterly, but it happens one local permit at a time. A tower modification, a small cell node on a utility pole, a conduit run down a street: each is authorized by a city or county, and each is a dated public record months before it appears in a capital-expenditure line.
What's in the data
The distinctions that separate a new site from an upgrade to an existing one.
| Signal | What it carries |
|---|---|
| Tower work | New build versus structural modification of an existing tower |
| Co-location | Antenna additions and swaps on an existing structure |
| Small cell | Node installs, typically on utility poles or streetlights, in the public right of way |
| Distributed antenna | In-building and campus DAS work |
| Fiber & conduit | Route construction, trenching, and boring |
| Support infrastructure | Equipment shelters, cabinets, generators and power service |
| Site geometry | Address, locality, county and CBSA, so build is mappable |
A telecom permit, decoded
Site work is filed in carrier and construction shorthand.
Who uses it
Frequently asked questions
Are cell tower permits public record?
Can you tell a new site from an upgrade?
Is small cell included?
Do you cover fiber routes?
How does this relate to data center coverage?
Get the Telecom & Fiber dataset
Nationwide, or scoped to the geographies and attributes you need.
Request a Sample